Consolidated Service Group (CSG) has the expertise in Tampa line striping design and pavement marking layouts of parking lots to ensure effective traffic flow and compliance with ADA regulations. For the past 20 years CSG has been proving high quality Tampa line striping services to commercial facilities.

When asphalt line striping and other pavement markings are clear to detect, visitors to your parking lot can park their cars easier, pedestrians are able cross safely and traffic flows are better managed moving in and out of the parking area.

What is the Process for Tampa Line Striping?

For a facility manager, it helps to understand the line striping process to be able to better plan for this necessary commercial maintenance service.

A local paving company, like our can be contracted to re-stripe a parking lot. Once on the job site, the Tampa line striping contractor will work with the facility manager to determine if the same lines will be re-striped or if a new layout would better accommodate the needs of the facility.

If a new Tampa line striping layout will be created, the paving contractor will take measurements of your parking lot, and then draw a sketch. The new Tampa line-striping layout will include the dimensions as well as any obstructions such as light poles, trees or other obstacles that can limit the number of parking spaces.

line stripe close up

Different Tampa Line Striping Layouts for Different Lot Shapes and Sizes

Each parking stall will be 18 feet deep and can be at 45, 50, 55, 60 or 90-degree angles. The depth of the parking lot and traffic flow will determine which angle will work best.

Following local zoning laws for handicap and fire zone clearances and distances, as well as the facilities requirements, an asphalt paving company can then paint the parking stalls and perform other Tampa line striping tasks as needed.

Getting a Lot Ready for Tampa Line Striping

Preparing a parking lot for new Tampa line striping is half the battle. First, the weather must be taken into consideration. The line striping project should be scheduled during dry weather. Not only does the area need to be dry when the paint is being applied, it’s also important to avoid rainfall for at least four hours after re-striping.

Skip to content
Consolidated Service Group
REQUEST PROPOSAL
To obtain a free estimate please call: 1-866-793-3735.
Or fill in the form below to request an online proposal:

Choose the service you're interested in: (Pick all that apply)